| Client |
Project Name |
Project Date |
Project Description |
| Portland Gas &
Coke |
Arrival of gas to Portland,
Oregon |
1957 |
49 miles of natural gas distribution
mains & services. |
| Portland Gas &
Coke |
Rainier to Clatskanie, Oregon
distribution system. |
1964 |
21 miles of natural gas distribution
mains & services. |
| Portland Gas &
Coke |
Beaverton to Hillsboro, Oregon
distribution system. |
1972 |
12 miles of natural gas distribution
mains & services. |
| NW Natural |
Hood River to Dee, Oregon
distribution system. |
1987 |
27 miles of natural gas distribution
mains & services. |
| Cascade Natural
Gas |
System reinforcement, Yakima,
Washington. |
1998 |
2 miles of natural gas main
installation. |
| Kiewit Construction |
Nike Campus Renovation, Beaverton,
Oregon |
1998 |
Excavation and directional
drilling to install the conduit duct bank for electrical and
fiber optic systems. |
| Kiewit Construction |
Level 3 Fiber Optic Loop,
Seattle |
1998 |
Excavation and directional
drilling to install the conduit duct bank for electrical and
fiber optic systems. |
| 360 Networks |
Level 3 Fiber Optic Loop,
Seattle / Bellevue |
1998 |
Excavation and directional
drilling to install the conduit duct bank for electrical and
fiber optic systems. |
| Enerfin |
Natural gas gathering well
system in Mist, Oregon |
1999 |
Installation of 2 miles of
6" well gathering pipe. |
| Portland General
Electric |
Canyon Cutover, Portland,
Oregon |
1999 |
Excavation and installation
of electrical duct bank and vaults. Tie into the existing electrical
system. |
| MCI Worldcom |
Tacoma Fiber Loop |
1999 |
Excavation and directional
drilling to install the conduit duct bank and vaults for the
fiber option system. |
| NW Natural |
Reinforcement and supply
line installation in Camas, Washington. |
2000 |
Installation of 1.5 miles
of 12" mains. |
| Fluor Global Services |
Level 3 Fiber Optic Loop,
Seattle to Sacramento |
2000 |
Excavation and installation
of fiber optic duct bank and vault installation within the Portland
metro area. |
| Pacific Gas &
Electric |
Natural gas pipeline installation
in Sacramento, California. |
2001 |
Installation of 4,500 feet
of 8" gas main. |
| Hoffman Construction |
Brewery Blocks, Portland,
Oregon |
2001 |
Trench and installation of
electrical and communication duct bank. Set several large vaults
for both the electrical and communication systems. |
| Portland General
Energy Solutions |
Brewery Blocks, Portland,
Oregon |
2001 |
Excavation and installation
of 2 - 20" steel pipes for a chilled water loop system. |
| Portland General
Broadband |
Brewery Blocks, Portland,
Oregon |
2001 |
Excavation and installation
of communication ducts bank and vaults. |
| Praxair |
Nitrogen piping in Pittsburg,
California. |
2002 |
Installation of 2,500 feet
of 8" nitrogen distribution system. |
| Portland General
Electric / City of Salem |
Portland Road - Phase I,
Salem, Oregon |
2002 |
Trench and installation of
12,200 feet of electrical, communication and natural gas duct
bank. Excavation and installation of the electrical and communication
vaults. Tie the new systems into the existing. Perform the
restoration of the AC streets and sidewalks. |
| Tualatin Valley
Water District |
130th & Butner, Beaverton,
Oregon |
2002 |
Excavate, prep and pave 7,200
square feet of a waterline trench. |
| Oregon Electric
Group |
Port of Portland - Terminal
4, Toyota Dock |
2003 |
Excavation and backfill of
20,000 feet of trench for electrical and communication duct
bank. Excavation and setting of the electrical vaults. |
| Salem Electric |
Portland Road - Valpak Road
Phase II, Salem, Oregon |
2003 |
Trench and installation of
1,900 feet of electrical, communication and natural gas duct
bank. Tie the duct banks into the existing utility systems. |
| Portland General
Electric |
47th Avenue SE, Salem, Oregon |
2003 |
Directional drill 8,700 feet
to install 6" and 4" conduit to replace the direct
bury electrical cable. Excavate and set the electrical vaults.
Perform the tie-ins into the new and existing vaults. |
| Portland General
Electric |
Gresham Yard Paving, Gresham,
Oregon |
2003 |
Dig out and pave 6,634 square
feet and overlay 71,390 square feet of asphalt parking lot. |
| Portland General
Electric |
OHSU Hillside Bore |
2003 |
Directional drill 420 feet
in rock and install 4 - 6" conduits. Provide and set 1
- 5106 vault and perform the tie-ins. |